PEC Lubartów – construction of a high-efficiency cogeneration system in containers 4 x CG170B-12 with an electrical power of 4.8 MWe and a thermal power of approximately 5.2 MWt. In addition, construction of a heat connection, a LV/MV switchboard, a power connection to the GPZ, and a gas connection. Implementation in the design and build formula.
Dowiedz się więcej
Combined Heat and Power Plant Szydłowiec
PEC Szydłowiec Cogeneration system for the Szydłowiec Combined Heat and Power Plant Generator model: CATERPILLAR CG132B-16 Power output: 0.99 MWe Fuel type: Natural gas
Meat Plant – 0.999MWe Stasin
Delivery of a cogeneration unit – for the Meat Plant in Stasin. Unit model: CG170-12 Power: 0.999 MWe Feed gas type: natural gas