PEC Lubartów – construction of a high-efficiency cogeneration system in containers 4 x CG170B-12 with an electrical power of 4.8 MWe and a thermal power of approximately 5.2 MWt. In addition, construction of a heat connection, a LV/MV switchboard, a power connection to the GPZ, and a gas connection. Implementation in the design and build formula.
Dowiedz się więcej
GREEN OFFICE BUILDING IN KRAKOW
Power: 1400 kVA Genset model: 2 x CAT® 3512 Eneria prepared the project from scratch, installed and launched a generating set with a power of over 2,240 kW.
ATRIUM KOSZALIN SHOPPING CENTER
Location: Koszalin Area: 75,000 m2 Years of implementation: 2007-2009 Contract value: PLN 14,900,000 SCOPE OF WORK Complete internal and external LV electrical installations, MV connection with transformer stations. OBJECT CHARACTERISTICS The mall building […]