PEC Lubartów – construction of a high-efficiency cogeneration system in containers 4 x CG170B-12 with an electrical power of 4.8 MWe and a thermal power of approximately 5.2 MWt. In addition, construction of a heat connection, a LV/MV switchboard, a power connection to the GPZ, and a gas connection. Implementation in the design and build formula.
Dowiedz się więcej
MICHELIN FACTORY STATION 110KV
Location: Olsztyn Area: 55,000 m2 Years of implementation: 2005-2006 Contract value: PLN 40,000,000 SCOPE OF WORK Construction of a 110/20 kV GPZ station to power the Michelin tire factory in Olsztyn. CHARACTERISTICS OF […]
KPEC Bydgoszcz – 1,56 MWe – Nakło at the river Noteć
KPEC Bydgoszcz – 1.56 MWe – Nakło nad Notecią Delivery of cogeneration systems for KPEC Bydgoszcz – 1.56 MWe – Nakło at the river Noteć Innovative CAT® solutions used in heating meet the […]