A five-star hotel on Katedralny Square in Wrocław – MV and LV internal and external electrical installations, reconstruction of telecommunication sewage system, installation of facade lighting architecturally adjusted to the historic part of Wrocław – 12 thousand m2.
Dowiedz się więcej
Gliwice Industrial Plant – 0.99 MWe
Delivery of a cogeneration system to an industrial plant of 0.999 MWe in a container structure. Model: CG170-12 Powered by: natural gas
GREEN OFFICE BUILDING IN KRAKOW
Power: 1400 kVA Genset model: 2 x CAT® 3512 Eneria prepared the project from scratch, installed and launched a generating set with a power of over 2,240 kW.