Construction of a modern high-efficiency gas cogeneration system based on a gas turbines – Taurus 60 for a new production line at the plant in Starachowice – Cerrad sp. z o.o.
Dowiedz się więcej
DATA CENTER – OŻARÓW MAZOWIECKI
Power: 1400 kVA Location: Ożarów Mazowiecki Varow Genset model: 2 x CAT® 3512 Eneria prepared the design of the power supply system, carried out tests for the devices, as well as their installation and […]
ALFAKO – 350 kWp
For ALFAKO – Eneria, complete documentation was prepared, and a set of photovoltaic panels was delivered and installed. The total power of the power plant is 350 kWp. Location: Kłecko. CATERPILLAR modules are a great solution for entrepreneurs.