Thanks to the use of a cogeneration system in Tarnobrzeg, after a year it will be possible to observe a decrease in greenhouse gas emissions by approximately 35,000 Mg/year and a reduction in primary energy consumption of approximately 92,000 GJ/year.
Investment implementation: Construction of a high-efficiency gas cogeneration source with a capacity of 8 MWe and 7.6 MWt in Tarnobrzeg – GUK II. The implementation includes the development of the project, delivery and assembly in a dedicated building and commissioning of four CAT G3516H cogeneration units, powered by natural gas.
Additionally, the scope of work includes the construction of an electricity connection to the Tarnobrzeg GPZ point.
Dowiedz się więcej
Jacht Conrad C144S
We delivered two engines C18 and C7.1 generator set for a new super-yacht built in Conrad Shipyard in Gdansk.
CHP Plant Pniówek – 4 MWe
Cogeneration system for Elektrociepłownia “Pniówek” – 4 MWe Genset model: CATERPILLAR CG170-20 Power: 2 x 2MWe Feed gas type: mine methane drainage gas Kontainer housing Thanks to the innovative CAT® technology, mining plants […]