Thanks to the use of a cogeneration system in Tarnobrzeg, after a year it will be possible to observe a decrease in greenhouse gas emissions by approximately 35,000 Mg/year and a reduction in primary energy consumption of approximately 92,000 GJ/year.
Investment implementation: Construction of a high-efficiency gas cogeneration source with a capacity of 8 MWe and 7.6 MWt in Tarnobrzeg – GUK II. The implementation includes the development of the project, delivery and assembly in a dedicated building and commissioning of four CAT G3516H cogeneration units, powered by natural gas.
Additionally, the scope of work includes the construction of an electricity connection to the Tarnobrzeg GPZ point.
Dowiedz się więcej
CRISTAL PARK
Location: Warsaw Area: 18,300 m2 Years of implementation: 2008-2009 Contract value: PLN 5,860,000 SCOPE OF WORK MV power connection with a transformer station. Internal low-voltage electrical installations for the Shell&Core range and further […]
Dako Printing House – 0.999 MWe – Lubartów
The CAT CG170-12 cogeneration unit powered by natural gas will generate 999 kWe and 680 kW of thermal power from the engine and 660 kg / h of steam at a pressure of […]