Thanks to the use of a cogeneration system in Tarnobrzeg, after a year it will be possible to observe a decrease in greenhouse gas emissions by approximately 35,000 Mg/year and a reduction in primary energy consumption of approximately 92,000 GJ/year.
Investment implementation: Construction of a high-efficiency gas cogeneration source with a capacity of 8 MWe and 7.6 MWt in Tarnobrzeg – GUK II. The implementation includes the development of the project, delivery and assembly in a dedicated building and commissioning of four CAT G3516H cogeneration units, powered by natural gas.
Additionally, the scope of work includes the construction of an electricity connection to the Tarnobrzeg GPZ point.
Dowiedz się więcej
Longliner Alkor
The fishing vessel was equipped with a Caterpillar M/E 3512C main engine with a gear, shaft and screw, and two C9.3 power generators. Source link to the article: https://www.gospodarkamorska.pl/Stocznie,Offshore/zobacz-jak-gdanska-stocznia-alkor-zbudowala-od-podstaw-statek-rybacki-foto-wideo.html
GREENHOUSE ‘JMP Flowers’ – 4,5MWe
Cogeneration system for greenhouse ‘JMP Flowers’ Power generator model: CATERPILLAR CG260-16 Power: 4,5MWe Supply power type: natural gas CAT® cogeneration systems installed in greenhouses can simultaneously supply electricity to the network, energy needed […]