Thanks to the use of a cogeneration system in Tarnobrzeg, after a year it will be possible to observe a decrease in greenhouse gas emissions by approximately 35,000 Mg/year and a reduction in primary energy consumption of approximately 92,000 GJ/year.
Investment implementation: Construction of a high-efficiency gas cogeneration source with a capacity of 8 MWe and 7.6 MWt in Tarnobrzeg – GUK II. The implementation includes the development of the project, delivery and assembly in a dedicated building and commissioning of four CAT G3516H cogeneration units, powered by natural gas.
Additionally, the scope of work includes the construction of an electricity connection to the Tarnobrzeg GPZ point.
Dowiedz się więcej
Cerrad – Taurus 60 Gas Turbine – 5MW
Construction of a modern high-efficiency gas cogeneration system based on a gas turbines – Taurus 60 for a new production line at the plant in Starachowice – Cerrad sp. z o.o.
GREEN OFFICE BUILDING IN KRAKOW
Power: 1400 kVA Genset model: 2 x CAT® 3512 Eneria prepared the project from scratch, installed and launched a generating set with a power of over 2,240 kW.