Delivery, design, and installation of a high‑efficiency cogeneration system based on gas engines, integrated with the existing technological system in Skarżysko‑Kamienna.
Design, construction, and commissioning of the cogeneration facility under a design, supply, and build (turnkey) scheme.
Units: 2 × CAT CG170B-20 with a capacity of 2300 MWe
The investment is currently under implementation.
Dowiedz się więcej
Sewage Treatment Plant OSM Łowicz – 0,6 MWe
Cogeneration system for the Sewage Treatment Plant OSM Łowicz – 0.6 MWe Genset model: CATERPILLAR CG132-12 Power: 0.6MWe Feed gas type: biogas Kontainer housing
FRENCH EMBASSY
Location: Warsaw Area: 5,800 m2 Years of implementation: 2003-2004 Contract value: PLN 1,750,000 SCOPE OF WORK Complete internal low-voltage electrical installations with a transformer station and a power generator. CHARACTERISTICS OF THE FACILITY […]