Delivery, design, and installation of a high‑efficiency cogeneration system based on gas engines, integrated with the existing technological system in Skarżysko‑Kamienna.
Design, construction, and commissioning of the cogeneration facility under a design, supply, and build (turnkey) scheme.
Units: 2 × CAT CG170B-20 with a capacity of 2300 MWe
The investment is currently under implementation.
Dowiedz się więcej
MPEC Stary Sącz Sp. z o.o. – 1,2MWe
The investment at Osiedle Słoneczne in Stary Sącz involves high-efficiency gas-fired cogeneration, based on a Caterpillar CG170B-12 generator set producing 1.2 MWe and 1.2 MWt. This system will provide heat for additional residential […]
MINNING COMPANY JSW S.A. KWK „Krupiński” in Suszec – 4MWe
Cogeneration system for Mining company JSW S.A. KWK „Krupiński” in Suszc Power generator model: CATERPILLAR G3520C Moc: 2 x 2MWe Supply gas type: gas from mine methane drainage Thanks to the innovative CAT® […]