Delivery, design, and installation of a high‑efficiency cogeneration system based on gas engines, integrated with the existing technological system in Skarżysko‑Kamienna.
Design, construction, and commissioning of the cogeneration facility under a design, supply, and build (turnkey) scheme.
Units: 2 × CAT CG170B-20 with a capacity of 2300 MWe
The investment is currently under implementation.
Dowiedz się więcej
Installation of Thermal Panels for ECO Tarnobrzeg
Installation of Thermal Panels for ECO Tarnobrzeg System capacity: 110 kWth Panels: TVP Solar High Vacuum Flat Panel (HVFP) MT‑Power v4 – 81 units Structure: COR‑TEN steel with enhanced resistance to atmospheric conditions
ANDRA 0.999MWe – GARWOLIN
ANDRA 0.999MWe – GARWOLIN Delivery of a cogeneration system with a steam generator for the Andra production plant in Garwolin. Aggregate model: CG170-12 Power: 0.999 MWe Steam output: 700 kg / h Supply […]