Design, construction and commissioning of a cogeneration facility in a container structure for the Production Plant in Kańczuga in the formula: Design, deliver and build turnkey.
Generators: CATCG170-12 with a capacity of less than 1 MWe, powered by natural gas.
Dowiedz się więcej
ALFAKO – 350 kWp
For ALFAKO – Eneria, complete documentation was prepared, and a set of photovoltaic panels was delivered and installed. The total power of the power plant is 350 kWp. Location: Kłecko. CATERPILLAR modules are a great solution for entrepreneurs.
KPEC Bydgoszcz – 1,56 MWe – Nakło at the river Noteć
KPEC Bydgoszcz – 1.56 MWe – Nakło nad Notecią Delivery of cogeneration systems for KPEC Bydgoszcz – 1.56 MWe – Nakło at the river Noteć Innovative CAT® solutions used in heating meet the […]