PEC Lubartów – construction of a high-efficiency cogeneration system in containers 4 x CG170B-12 with an electrical power of 4.8 MWe and a thermal power of approximately 5.2 MWt. In addition, construction of a heat connection, a LV/MV switchboard, a power connection to the GPZ, and a gas connection. Implementation in the design and build formula.
Dowiedz się więcej
CHP PLANTS KPEC BYDGOSZCZ II – 1.56 MWE – KORONOWO
Delivery of a cogeneration unit for installation in the heat and power plant building. Power: 1,56 MWe Unit model: CG170-16 Feed gas type: natural gas Innovative CAT® solutions used in heating meet […]
Meat Processing Plant – 2.3MWe
This is another delivered unit with a capacity of 2.3 MWe, which will complement the energy system in one of the leading Meat Processing Plants in Poland. In total, the system has 2 […]