Design, construction and commissioning of a cogeneration facility in a container structure for the Production Plant in Kańczuga in the formula: Design, deliver and build turnkey.
Generators: CATCG170-12 with a capacity of less than 1 MWe, powered by natural gas.
Dowiedz się więcej
PGE ELECTROPOWER PLANTS OPOLE
Location: Ople Installed power: 2 x 2MW Eneria has prepared a project for the third largest coal-fired power plant in Poland. It installed and commissioned generating sets with a capacity of 4 MW. […]
DAIRY PLANT ‘OSM PIĄTNICA 2’ – 4 MWe
Cogeneration system for Daily Plant ‘OSM PIĄTNICA 2’ Power generator model: 2 x CATERPILLAR G3512E, 1 x CATTERPILLAR G3516H Total power capacity: 4 MWe Supply gas type: natural gas, high-methane E type
ATRIUM KOSZALIN SHOPPING CENTER
Location: Koszalin Area: 75,000 m2 Years of implementation: 2007-2009 Contract value: PLN 14,900,000 SCOPE OF WORK Complete internal and external LV electrical installations, MV connection with transformer stations. OBJECT CHARACTERISTICS The mall building […]