Design, construction and commissioning of a cogeneration facility in a container structure for the Production Plant in Kańczuga in the formula: Design, deliver and build turnkey.
Generators: CATCG170-12 with a capacity of less than 1 MWe, powered by natural gas.
Dowiedz się więcej
PEC Brodnica 2 MWe
PEC Brodnica 2 MWe Delivery of a cogeneration unit for PEC in Brodnica. Power: 2 MWe Supply gas type: natural gas Innovative CAT® solutions used in heating meet the demand for useful […]
MPEC Stary Sącz Sp. z o.o. – 1,2MWe
The investment at Osiedle Słoneczne in Stary Sącz involves high-efficiency gas-fired cogeneration, based on a Caterpillar CG170B-12 generator set producing 1.2 MWe and 1.2 MWt. This system will provide heat for additional residential […]